Riders planning to explore the eastern Yarra Ranges should be aware that Mt Donna Buang Road is closed between Mount Toolebewong and the Mt Donna Buang Road summit due to a landslip.
Riders will continue to have access to Mt Donna Buang via Warburton.
The landslip site on Donna Buang Road is currently being assessed by geotechnical engineering experts.
The scale of roadworks and timeframe required to repair the landslip site will be determined by early February.
Three other landslip sites nearby – along Acheron Way and Donna Buang Road in Warburton, and East Warburton – have already been assessed by and detailed designs are currently underway for the repair of these roads, with works expected to start in 2022.