Riders along Gardiner’s Creek Trail under the freeway in Toorak will be paused periodically this Thursday and Friday.
Contractors are inspecting the bearings in the freeway overhead.
These inspections will take 3-5 minutes at a time and pedestrians and riders will be able to pass through after each inspection.