Riders in the ranges east of Melbourne may encounter works to repair landslips at sites in Warburton and East Warburton between now and the end of the year.
Acheron Way will be closed between the Rainforest Gallery and Marysville Road, from Monday 5 September to mid-December to repair two landslip sites.
Riders are advised to detour via Maroondah Highway, Healesville-Koo Wee Rup Road and Warburton Highway.
There will be a lane closure on Donna Buang Road near Acheron Way. One traffic lane will continue to remain open, with portable traffic lights on-site to help drivers continue travelling in both directions. Expect minor delays.
A fourth landslip site, located on Donna Buang Road is under review by geotechnical experts.
Donna Buang Road will remain closed between Mount Toolebewong and the Mt Donna Buang for the safety of all road users and will reopen when repairs are complete and when it’s safe to do so.
Drivers will continue to have access to the Mt Donna Buang Road summit via Warburton.
Works will occur between 7am and 5pm.
The repair and stabilisation works include:
- Excavating and removing the damaged pavement Building retaining walls
- Reinstating and stabilising the road layers Building up the asphalt layers to provide a smooth and strong road for all road users Drainage improvements