Designs for the new Narre Warren Station and level crossing removal at Webb Street have been released.
Webb Street is a strategic cycling corridor that connects nearby to other SCC’s being provided along the Princess Highway and Narre Warren North Road.
New pathways through the precinct, a secure Parkiteer cage and bike hoops are included in the design along with a landscaped forecourt, featuring elevated platforms with access via lifts and stairs, shelter and lighting, security cameras, a kiosk, and air conditioned waiting room.
There will be a signalised pedestrian crossing on Webb Street.
Construction on the project is scheduled to start later this year and will be completed by 2025.